Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 1600

Wellington region maintenance programme

$
0
0

 

Information about roadworks in the Wellington and Kāpiti regions

Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for  Sunday 26March - Saturday 1 April 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.

Sunday 26 March - Saturday 1 April 2017

Wairarapa  

State Highway 2 

    

  

Location

  
  

Type of work

  
  

Start date

  

Chapel St, Masterton, south of Russell Street for 150 metres

Stop/go traffic control to resurface road with asphalt

Link to letter

Paving

Sunday 26 th  – Monday 27 th 

7pm-5.30am

Dixon/Queen/Chapel Streets roundabout, Masterton

Stop/go traffic control to resurface roundabout road with asphalt

Link to letter

Paving

Tuesday 28 th  - Wednesday 29 th

 

Mt Bruce

Stop/go northbound traffic control for works to level road shoulders

Road shoulder

Wednesday 29 th

8am-4pm

Wellington - Kāpiti

State Highway 1 

      

  

Location

  
  

Type of work

  
  

Start date

  

Arras Tunnel

Detour via Cambridge Terrace while tunnel closed for maintenance work (extra to the routine maintenance closure)

Tunnel maintenance

COMPLETED

Monday 27 thTuesday 28Wednesday 29th   

8pm-5.30am

Willis Street to Terrace Tunnel

Lane closed to waterblast   weepholes in trench retaining walls and inspect CCTV connections

Link to letter

Maintenance

Monday 27 th– Thursday 30 th 

9pm-4am

Vivian Street, Tory Street intersection

Lane closed for traffic light cables and CCTV chamber installation

Link to CCTV and traffic monitoring information

Link to letter

Traffic safety

Sunday 26 th– Thursday 30 th 

Clifton Terrace on-ramp

Detour via other on-ramps while ramp closed to repair guardrail and works take place in Shell Gully car park

Link to letter

Barrier repairs

Sunday 26 th

7pm-5.30am

Seawall, Urban motorway

Southbound lane closed to repair seawalls

Link to letter

Seawall

Sunday 26 th– Thursday 30 th 

7pm-5.30am

Johnsonville northbound off-ramp, Ngauranga Gorge

Detour via Churton Park off-ramp while ramp closed for   traffic sensor work

Traffic signals

Wednesday 29 th

10pm-5.30am

Tawa S-bends

Lane closed to install service chamber lids

Underground services

Wednesday 29 th 

7pm-5.30am

Tawa southbound off-ramp

Warning signs on the ramp ahead of stop/go traffic control to chipseal Takapu Road

Wellington City Council chipsealing

Thursday 30 th

7pm-5.30am

Plimmerton

Southbound lane closed to install broadband cable for properties between Steyne Avenue and Grays Road intersections

Telecoms

Monday 27 th

9am-3.30pm

Plimmerton roundabout

Northbound lane closed to repair guardrail

Barrier repair

Monday 27 th

9am-3pm

Pukerua Bay, north of Beach Road

Lane closure to repair broadband fibre connection

Telecoms

Sunday 26 th

7pm-5.30am

Coast Road, north of Pukerua Bay

Northbound stop/go traffic control to replace damaged guardrail

Guardrail

Sunday 26 th– Tuesday 28 th

8pm-5.30am

Coast Road cycle lane painting

Stop/go traffic control to paint cycle lanes

Cyclist safety

Tuesday 28 th  –Thursday 30 th

7pm-5.30am

Paekakariki, Sang Sue corner south of Mackays Crossing

Stop/go traffic control to extend project barriers

Transmission   Gully Project

Sunday 26 th

7pm-5.30am

Raumati Straight

Lane closures to resurface lanes

Mackays-Peka   Peka  Expressway

Sunday 26 th– Friday 31 st

Various times day and night

Paraparaumu, near Raumati Road

Southbound lane closed for vegetation clearing

Kapiti Coast District Council Vegetation

Thursday 30 th

9am-4pm

Waikanae

Northbound stop/go traffic control to fell trees that are road safety risks

Road   safety

Tuesday 28 th– Wednesday 29 th 

8am-4pm

Peka Peka passing lane

Northbound lane closed to remove passing lane

Passing lane closure

Sunday  –   Saturday   

24 hours

North of Peka Peka passing lane to Te Hapua Road

Stop/go traffic management to repair culvert

Drainage

Sunday 26 th– Thursday 30 th 

7pm-5.30am

Forest Lakes, north of Otaki

Northbound lane closed to repair guardrail at bottom of hill passing lanes

Guardrail

Tuesday 28 th

9am-4pm

Ohau

Northbound lane closed to level road shoulders

Road shoulder

Thursday 30 th

8pm-5pm

State Highway 2     

      

  

Location

  
  

Type of work

  
  

Start date

  

Southbound off-ramp traffic lights under motorway flyover

Detour along motorway to Aotea Quay off and on-ramps while   traffic sensors being repaired

Traffic signals

Wednesday 29 th

10pm-5.30am

Melling to Block Road, green cycle lane painting

Stop/go traffic control to paint green cycle lanes – various sites

Cyclist safety

 

Tuesday 28 th  –Thursday 30 th

7pm-5.30am

Near Hebden Crescent

Lane closed for road surface repairs

Paving

Thursday 30 th

7pm-5.30am

SH2/58 Haywards Hill interchange
Lane closures for interchange works

Stay alert for queues. If possible, please focus on driving rather than slowing down to view project activities to avoid causing queues.

Interchange project

Monday 27 th– Friday 31 st 

9am-4pm

Brown Owl, Upper Hutt, Fergusson Drive to north   of Akatarawa Road

Stop/go traffic control to resurface the road with asphalt and reposition road markings

Link to letter 

Paving

Sunday 26 th  –

Wednesday 29 th

7pm-5.30am

Near Topaz Street, green cycle lane painting

Stop/go traffic control to paint green cycle lanes – various sites

Cyclist safety

 

Tuesday 28 th  –Thursday 30 th

7pm-5.30am

State Highway 58 

      

  

Location

  
  

Type of work

  
  

Start date

  

Near Moonshine Hill Road intersection

Stop/go traffic control to make surface repairs

Paving

Thursday 30 th

7pm-5.30am


Viewing all articles
Browse latest Browse all 1600

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>