Information about roadworks in the Wellington and Kāpiti regions
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for Sunday 3023 April- Saturday 6 May29 April 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
Saturday 29 April, 6am-8pm
State Highway 2/58 Haywards intersection: Take care getting used to the new layout.State Highway 2, south of the Melling traffic lights
Southbound lane for Northpower to make emergency repairs to a faulty cable
Sunday 3023 April - Saturday 6 May29 April 2017
State Highway 1
Peka Peka passing lane
Northbound lane closed to remove passing lane
Passing lane removal
Closed 24 hours
√
√
√
√
√
√
√
Forest Lakes to Otaki passing lane
Southbound passing lane closed for holiday traffic
Safety
10am-8pm
√
Location |
Type of work |
Hours |
Sun 30 |
Mon 1st |
Tue 2 |
Wed 3 |
Thu 4 |
Fri 5 |
Sat 6 |
Vivian
| Analysis | 7pm-5.30am |
|
| √ |
|
|
|
|
Basin Reserve, Sussex Street Lane closed to clean waste water system | Services | 7pm-5.30am |
|
|
| √ | √ |
|
|
Vivian Street, corner Taranaki Street Lane closed for hydrant repairs | City Care | 7.30pm-2am | | | | √ | √ | | |
Basin Reserve, Sussex Lane closed to resurface with asphalt | Paving | 7pm-5.30am | | √ | | | | | |
Urban
| Barriers | 8am-4pm |
| √ |
|
|
|
|
|
Ngauranga Gorge, Newlands southbound off-ramp Detour to bottom of gorge and back up again while off-ramp is closed to resurface with asphalt | Paving | 10pm-5.30am |
|
|
|
| √ |
|
|
Ngauranga Gorge, northbound and southbound opposite Kiwi Point Lane closures for project finishing works | Smart Motorway project | 7pm-5.30am | √ | √ | √ | √ | √ | | |
Churton Park Detour via Johnsonville while top of off-ramp is resurfaced
| Paving | 7pm-5.30am | √ | | | | | | |
Kapiti Expressway Lane closed for finishing works at:
| -Raumati South | -Peka Peka |
| √ |
| √ | √ | √ |
|
-Bridge surveys
|
| 9pm-2.30am | √ |
|
|
|
|
|
|
Raumati Straight Southbound lane closures for expressway works | Kāpiti Expressway project | Various times | | √ | √ | √ | √ | √ | √ |
Otaihanga roundabout north, old Stop/go traffic control to clear culverts | Drainage | 9am-4pm | | | | | | √ | |
Peka Peka, Old SH1 Stop/go traffic control to pave Hadfield link road | Expressway project | 7pm-5.30am | | | | √ | √ | | |
Old SH1 Lane closed to maintain power poles – various locations | Electra | 8.30am-4.30pm | | √ | √ | √
| √
| √ | |
State Highway 2
Location |
Type of work |
Hours |
Sun 30 th |
Mon 1st |
Tue 2 nd |
Wed 3 rd |
Thu 4 th |
Fri 5 th |
Sat 6 th |
Urban motorway, Ngauranga Lane closures for project finishing works | Smart Motorway project | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|
Petone on-ramp Detour via Dowse interchange while ramp closed to replace traffic volume sensors | Traffic sensors | 10pm-4.30am |
| √ |
|
|
|
|
|
South of Grounsell Crescent Northbound lane closed to resurface with asphalt | Paving | 7pm-5.30am |
|
| √ |
|
|
|
|
Kennedy Good Bridge intersection Southbound stop/go traffic control to resurface with asphalt | Paving | 7pm-5.30am |
|
|
| √ | √ |
|
|
North of Block Road, Melling, to south of Haywards Interchange Northbound lane closed for spraying with diluted bitumen to strengthen road surface – various sections Southbound lane closed briefly for 400m south of Liverton Road for spraying with diluted bitumen | Rejuvenation | 9am-4pm May open earlier |
| √ | √ |
|
|
|
|
Totara Park intersection Stop/go traffic control to repair guardrail | Guardrails | 7pm-5.30am |
|
| √ |
|
|
|
|
SH2/58 Haywards Hill interchange Lane closures for interchange finishing works | SH2/58 project | Various times | √ | √ | √ | √ | √ | √ |
|
Te Marua, south of golf course Stop/go traffic control for trucks accessing/exiting riverbank stabilisation works | Riverbank works | 8.30am- 3.30pm |
| √ | √ | √ | √ | √ |
|
Kaitoke Stop/go traffic control to clear slip | Slip clearing | 7pm-5.30am | √ |
|
|
|
|
|
|
Rimutaka Hill Road Stop/go traffic control at various sites to: -Resurface with asphalt south of the summit -Replace signs -Clear drainage channels -Repair guardrails | Paving, maintenance | 8am-4pm |
| √ | √ | √ | √ | √ |
|
Location |
Type of work |
Hours |
Sun 23 rd |
Mon 24 th |
Tue 25 th |
Wed 26 th |
Thu 27 th |
Fri 28 th |
Sat 29 th |
Grounsell Crescent to Melling Southbound lane to take core samples for road structure analysis | Analysis | 7pm-5.30am |
|
|
| √ | √ |
|
|
SH2/58 Haywards Hill interchange Lane closures for interchange works and installing forewarning signs at Fergusson Drive, Silverstream, and Hebden Crescent | SH2/58 project | Various times during the day |
|
|
| √ | √ | √ |
|
Te Marua, south of golf course Stop/go traffic control for trucks accessing/exiting riverbank stabilisation works | Riverbank works | 8.30am- 3.30pm |
|
|
| √ | √ | √ |
|
Rimutaka Hill Road Stop/go traffic control to resurface with asphalt – various sites | Paving | 8am-4pm |
|
|
| √ | √ | √ |
|
Rimutaka Hill Road Stop/go traffic control to repair truck caution sign | Signage | 8am-4pm |
|
|
| √ |
|
|
|
Rimutaka Hill Road, north of the summit Stop/go traffic control to maintain drains | Drainage | 8am-4pm |
|
|
|
|
| √ |
|
State Highway 58
√
√
√
√
Paremata Road, from Postgate Drive to Paremata
Stop/go traffic control to install new grates over sumps
Drainage
7pm-5.30am
√
√
√
Location |
Type of work |
Hours |
Sun 30 |
Mon 1st |
Tue 2 |
Wed 3 |
Thu 4 |
Fri 5 |
Sat 6 |
SH2/58 Haywards Hill interchange Stop/go traffic control to install ducts under the road | SH2/58 | 7pm-5.30am | √
|
|
|
|
|
|
|