Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 1600

Wellington region maintenance programme

$
0
0

 

 

Information about roadworks in the Wellington and Kāpiti regions

Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 3023 April- Saturday 6 May29 April 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.

  • Saturday 29 April, 6am-8pmState Highway 2/58 Haywards intersection:  Take care getting used to the new layout.

    State Highway 2, south of the Melling traffic lights

    Southbound lane for Northpower to make emergency repairs to a faulty cable

Sunday 3023 April - Saturday 6 May29 April 2017

State Highway 1  

                                                    

Peka Peka passing lane

Northbound lane closed to remove passing lane

Passing lane removal

Closed 24 hours

Forest Lakes to Otaki passing lane

Southbound passing lane   closed for holiday traffic

Safety

10am-8pm

 

 

 

 

 

 

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 3023thrd   

  
  

Mon 1st24 th

  
  

Tue 225ndth

  
  

Wed 326rdth

  
  

Thu 427th

  
  

Fri 528th   

  
  

Sat 629th 

  

VivianCobham Drive

Southbound lane closed to take core samples for road structure analysis

Analysis

7pm-5.30am

 

 

 

 

 

 

Basin Reserve, Sussex Street

Lane closed to clean waste water systemlevel service chamber lids

Services

7pm-5.30am

 

 

 

 

 

Vivian Street, corner Taranaki Street

Lane closed for hydrant repairs

City Care

7.30pm-2am7pm-Midnight

  

  

  

  

  

Basin Reserve, SussexVivian Street, from Tory Street to Kent Terrace

Lane closed to resurface with asphaltlevel service chamber lids

PavingServices

7pm-5.30am

  

 

  

 

 

  

  

UrbanWellington urban motorway, Ngauranga tosouth of Aotea Quayonramp

Northbound lane closed to repair guardrails

Barriers

8am-4pm

 

 

 

 

 

 

Ngauranga Gorge, Newlands southbound off-ramp

Detour to bottom of   gorge and back up again while off-ramp is closed to resurface with asphalt

Link to notice

Paving

10pm-5.30am

 

 

 

 

 

 

Ngauranga Gorge, northbound and southbound opposite   Kiwi Point

Lane closures for project finishing worksclosed to spray   bitumen emulsion for road surface rejuvenation. Traffic control trucks will   lead vehicles through when sprayer is operating – brief periods

Smart Motorway projectPaving

7pm-5.30am9.30am-4pm

 

 

 

 

  

  

Churton ParkPorirua, Whitford Brown traffic lights southbound off-ramp

Detour via Johnsonville   while top of off-ramp is resurfacedSouthbound lane closed to lay skid-resistant surface

Detours Thursday night when on and off-ramps closed - follow traffic controllers' directions

Paving

7pm-5.30am

 

  

 

 

  

  

  

Kapiti ExpresswayPOSTPONED

Lane closed for finishing works at:Plimmerton

Southbound lane closed to maintain water valves

-Raumati SouthWellington Water

-Peka Peka9.30am-3.30pm

 

 

 

-Bridge surveysPukerua Bay, northern end

Stop/go traffic control to replace threshold signs

Signage

9pm-2.30am

 

 

 

 

 

 

Raumati Straight

Southbound lane closures for expressway works

Kāpiti  Expressway   project

Various times day and night

  

 

 

Otaihanga roundabout north, oldParaparaumu, Old SH1

Stop/go traffic control to clear culvertsSouthbound lane closed to maintain roadside gardens

DrainageKCDC

9am-4pm9am-4.30pm

  

  

  

  

 

  

Peka Peka, Old SH1SH1, north of Waikanae

Stop/go traffic control to pave Hadfield link roadclear drains

Expressway   projectDrainage

7pm-5.30am8am-4pm

  

  

  

 

 

 

  

Old SH1Peka Peka

Lane closed to maintain   power poles – various locationsStop/go traffic control to install wire rope barrier

ElectraKāpiti   Expressway

8.30am-4.30pm7pm-5.30am

  

 

 

 

 

  

                      

                   

State Highway 2

                           

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 30 th  

  
  

Mon 1st

  
  

Tue 2 nd

  
  

Wed 3 rd

  
  

Thu 4 th

  
  

Fri 5 th  

  
  

Sat 6 th 

  

Urban motorway, Ngauranga

Lane closures for project finishing works

Smart Motorway project

7pm-5.30am

 

 

Petone on-ramp

Detour via Dowse   interchange while ramp closed to replace traffic volume sensors

Traffic sensors

10pm-4.30am

 

 

 

 

 

 

South of Grounsell Crescent

Northbound lane closed to resurface with asphalt

Paving

7pm-5.30am

 

 

 

 

 

 

Kennedy Good Bridge intersection

Southbound stop/go traffic control to resurface with asphalt

Paving

7pm-5.30am

 

 

 

 

 

North of Block Road, Melling, to south of   Haywards Interchange

Northbound lane closed for spraying with diluted bitumen to strengthen road surface – various sections  

Southbound lane closed briefly   for 400m south of Liverton Road for spraying with diluted bitumen

Rejuvenation

9am-4pm

May open earlier

 

 

 

 

 

Totara Park intersection

Stop/go traffic control to repair guardrail

Guardrails

7pm-5.30am

 

 

 

 

 

 

SH2/58 Haywards Hill interchange

Lane closures for interchange finishing works

SH2/58 project

Various times

 

Te Marua, south of golf course

Stop/go traffic control for trucks accessing/exiting riverbank stabilisation works

Riverbank works

8.30am- 3.30pm

 

 

Kaitoke

Stop/go traffic control to clear slip

Slip clearing

7pm-5.30am

 

 

 

 

 

 

Rimutaka Hill Road

Stop/go traffic control at various sites to:

-Resurface with asphalt   south of the summit

-Replace signs

-Clear drainage channels

-Repair guardrails

Paving, maintenance

8am-4pm

 

 

                         

                          

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 23 rd 

  
  

Mon 24 th

  
  

Tue 25 th

  
  

Wed 26 th

  
  

Thu 27 th

  
  

Fri 28 th 

  
  

Sat 29 th 

  

Grounsell Crescent to Melling

Southbound lane to take core samples for road structure analysis

Analysis

7pm-5.30am

 

 

 

 

 

SH2/58 Haywards Hill interchange

Lane closures for   interchange works and installing forewarning signs at Fergusson Drive, Silverstream,   and Hebden Crescent               

SH2/58 project

Various times during the day

 

 

 

 

Te Marua, south of golf course

Stop/go traffic control for trucks accessing/exiting riverbank stabilisation works

Riverbank works

8.30am- 3.30pm

 

 

 

 

Rimutaka Hill Road

Stop/go traffic control to resurface with asphalt – various sites

Paving

8am-4pm

 

 

 

 

Rimutaka Hill Road

Stop/go traffic control to repair truck caution sign

Signage

8am-4pm

 

 

 

 

 

 

Rimutaka Hill Road, north of the summit

Stop/go traffic control to maintain drains

Drainage

8am-4pm

 

 

 

 

 

 

                             

State Highway 58 

                               

 

Paremata Road, from Postgate Drive to Paremata

Stop/go traffic control to install new grates over sumps

Drainage

7pm-5.30am

 

 

 

 

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 3023thrd   

  
  

Mon 1st24 th

  
  

Tue 225ndth

  
  

Wed 326rdth

  
  

Thu 427th

  
  

Fri 528th   

  
  

Sat 629th 

  

SH2/58 Haywards Hill interchangeNo major works   scheduled

Stop/go traffic control to install ducts under the road

SH2/58 

7pm-5.30am 

 

 

 

 

 

 

 

                                            

                             

 

 


Viewing all articles
Browse latest Browse all 1600

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>