Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 1600

Wellington region maintenance programme

$
0
0

 

 

Information about roadworks in the Wellington and Kāpiti regions

Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 21 May- Saturday 27 May 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.

TUNNELS, MONTHLY MAINTENANCE:Link to 2017 calendar

COBHAM DRIVE TRAFFIC SIGNALS PROJECT: Link to information leaflet

Sunday 21 May - Saturday 27 May 2017

State Highway 1  

                               

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 21 st    

  
  

Mon 22 nd 

  
  

Tue 23 rd  

  
  

Wed 24 th 

  
  

Thu 25 th

  
  

Fri 26 th  

  
  

Sat 27 th 

  

Vivian Street, from Victoria Street to Tory   Street

Lane closed for   footpath repairs

Footpath repair

7pm-5.30am

 

 

 

Vivian Street/Tory Street intersection

Lane closed to remove   corrugated steel roof from verandah

Building

7pm-5.30am

 

 

 

 

 

 

Vivian Street to Basin Reserve

Stop/go traffic control for repainting road lines

Lane marking

7pm-5.30am

 

 

Basin    Reserve, Sussex Street to Cambridge Terrace

Lane closed for raising level of service chamber lids

Services

7pm-5.30am

 

 

 

 

 

The Terrace Tunnel closed

Detours signposted via   other motorway off and on-ramps while tunnel closed for maintenance

Tunnel

Midnight Thursday - 5.30am

 

 

 

  √

 

 

Aotea Quay off-ramp closed

Detour via other off-ramps while quay being resurfaced

Paving

7pm-5.30am

 

 

  √

 

 

South of Porirua, Linden

Lane closed for centre median construction

Transmission Gully project

7pm-5.30am

 

 

Plimmerton Weighbridge

Expect traffic controls for service chamber lid inspection

Services

9am-3.30am

 

 

 

 

 

 

Kapiti Expressway – Raumati Straight, Te Moana   Road off ramp, and Peka Peak end

Expect traffic controls at various times for finishing works

Expressway   project

Various times day and night

 

   

New Raumati South roundabout site, Poplar Avenue/Old SH1 intersection

NEW INTERSECTION OPENS WEDNESDAY 4.30pm

 

Expressway   project

All day, night

 

 

 

 

Old SH1 Paraparaumu - Levin

Lane closed to maintain power poles – various locations

Electra

8.30am-4.30pm

 

   √

 

Manakau Rail Overbridge

Stop/go traffic control to lay skid-resistant asphalt surface on overbridge

Link to notice

Paving

7pm-5.30am

  

 

  √

 

 

 

                            

                    

State Highway 2

                                                

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 21 st    

  
  

Mon 22 nd 

  
  

Tue 23 rd  

  
  

Wed 24 th 

  
  

Thu 25 th

  
  

Fri 26 th  

  
  

Sat 27 th 

  

SH2 Ngauranga intersection with Centennial   Highway/Jarden Mile

Lane closed for   resurfacing with asphalt

Paving

7pm-5.30am

 

 

 

 

 

 

Petone southbound on-ramp closed

Detour signposted via Dowse interchange while skid-resistant surface laid over on-ramp

Paving

10pm-5.30am

 

 

 

 

 

 

SH2/58 Haywards Hill interchange

Lane closures for   interchange finishing works

SH2/58 project

7pm-5.30am

   

 

Upper Hutt, Gibbons Street intersection north and   south

Follow the detour signs

Detours while   intersection resurfaced

Link to notice

Paving

7pm-5.30am

 

 

 

√  

 

 

Upper Hutt, Totara Park intersection

Northbound lane closed for guardrail repair

Barrier repair

9am-3.30pm

 

 

 

 

 

 

Upper Hutt, north of Topaz Street, Birchville

Stop/go traffic control to install new guardrail

Link to notice

Barrier renewal

7pm-5.30am

 

 

Te Marua, south of golf course

Caution required for trucks accessing/exiting riverbank stabilisation works

Riverbank works

8.30am- 3.30pm

 

 

Rimutaka Hill Road

Stop/go traffic control at various sites to replace signs

Signs

8am-4pm

 

 

                                     

State Highway 58 

                                                  

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 21 st    

  
  

Mon 22 nd 

  
  

Tue 23 rd  

  
  

Wed 24 th 

  
  

Thu 25 th

  
  

Fri 26 th  

  
  

Sat 27 th 

  

Haywards Hill by quarry

Stop/go traffic control to install ducts under road

SH2/58 project

7pm-5.30am

 

 

             

 


Viewing all articles
Browse latest Browse all 1600

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>