Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 1600

Wellington region maintenance programme

$
0
0

 

 

Information about roadworks in the Wellington and Kāpiti regions

Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 114 June - Saturday 17JuneSaturday 10 June 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.

TUNNELS, MONTHLY MAINTENANCE:Link to 2017 calendar

 Queen’s Birthday Weekend 3-5 June

Passing lane closures

  • Friday, Saturday: Te Horo to Otaki northbound passing lane closed 10am-8pm
  • Monday: Passing lane south from Forest Lakes to Otaki roundabout closed 10am-8pm

 Saturday 3 June

South of Silverstream traffic lights: Southbound lane closed to install sign 7am-4pm

Sunday 114 June - Saturday 1710 June 2017

State Highway 1  

                             

 

 

 

 

 

Urban motorway near Tinakori northbound on-ramp

Lane closed for   vegetation maintenance

Vegetation

9pm-5.30am

 

 

 

 

 

 

Linden, south of Porirua

Lane closed for centre   median construction

Transmission Gully project

7pm-5.30am

   √

 

 

   √

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 114th      

  
  

Mon 125th

  
  

Tue 136th   

  
  

Wed 147th   

  
  

Thu 158th 

  
  

Fri 169th   

  
  

Sat 1710th

  

Cobham Drive/Evans Bay Parade intersection

Lane closedCaution required for traffic signalstraffic   signals upgrade

Traffic signals

7pm-5.30amMonday 8pm-5.30am

 

 

The Terrace Tunnel

Detour via other on and   off-ramps while tunnel closed for maintenance

Tunnel

9pm-5.30am

 

 

 

 

 

 

Urban motorway southbound from Aotea Quay –  Murphy Street off-ramps

  •   Monday

DETOUR via Aotea Quay   while road being resurfacedTuesday- Thursday

  •   Tuesday,   Wednesday, Thursday

Southbound lane closed   for bridge joint works

Paving, bridge joints

9pm-5.30am 7pm-5.30am

 

Mt Victoria TunnelVivian Street to Basin Reserve

Detour via Newtown or harbour bays while tunnel closed for maintenanceStop/go traffic control to paint road markings

TunnelRoad marking

9pm-5.30am7pm-5.30am

 

 

 

 

 

 

Arras Tunnel

Detour via Cambridge   Terrace while tunnel closed for maintenance

Tunnel

9pm-5.30am

 

 

 

 

 

 

 Vivian   Street to Basin Reserve

Stop/go traffic control to paint road markings

Road marking

Various times at night

 

 

 Kent  Kent Terrace

LeftBus lane closed to   monitorto monitor wastewater and install alarm

Wastewater

7pm-5.30am10pm-5.30am

 

 

 

 

 

 

 

 

Churton Park southboundTawa, northbound on-ramp lighting installation

  •   Sunday,   Monday, Tuesday

DETOUR for GrenadaDetour via Churton Park  Village traffic over Westchester Overbridgeoff and on-ramps to head north on SH1 while southboundTawa northbound on-ramp closed to   replace lampposts

Link to detour notice

Link to information

State highway left-hand   lane closed

  •   Wednesday   and Thursday

On-ramp open

State highway left-hand   lane closed

Lighting

9pm-5.30amMonday 10pm-5.30am

Tuesday-Thursday 9pm-5.30am

 

 

 

Whitford Brown, near northbound off-rampLinden, south of Porirua

Northbound laneLane closed   to repair lightfor centre median construction

LightingTransmission Gully project

7pm-5.30am

 

 

 

   √

 

 

 

 

North of Whitford Brown intersectionParemata Bridge

NorthboundSouthbound lane closed for  to install stormwater drainbridge works

DrainageBridge works

5.30am-4pm9.30am-3.30pm

 

 

   √

 

 

Paremata BridgeMana Esplanade, south of Pascoe Avenue

Divert on different   route around roundabouts while lanes closed for resurfacingSouthbound lane closed to haul broadband cable through existing manholes

PavingTelecoms

9.30am-3.30pm9.30am-3pm

 

 

 

 

   √

 

 

Mana Esplanade

Lane closed for road marking

Road marking

7pm-5.30am

 

 

 

Coast Road

Stop/go northbound   traffic control for footpath repairs

Footpath repair

7pm-5.30am

 

 

 

 

 

 

 

 

Kapiti Expressway – Raumati Straight and Peka   PekaPeka Peka

Expect traffic controls at various times for finishing works

Expressway   project

Various times day and night

 

   √

   √

Old SH1, Paraparaumu to Levin

Lane closed to maintain   powermaintain power poles – various locations

Electra

8.30am-4.30pm

 

 

   √

 

Waikanae to Levin

Stop/go at various   locations for road marking

Road marking

7pm-5.30am

 

 

 

Forest Lakes to Otaki passing lane

Southbound lane closed for holiday traffic control

Passing lane closure

10am-8pm

 

 

 

 

 

 

                             

                       

                                                               

State Highway 2

                                      

  

Hours

  
  

Hours

  

7pm-5.30am

7pm-5.30am

8pm-5.30am

9.30pm-5.30am

SH2/58 project

Various times day and night

   √

 

Haywards to Te Marua

Stop/go traffic control to paint  road markings, various sites

Road marking

Various times at night

 

 

7am-5.30pm

8pm-5.30am

9am-4pm

9am-4pm

7pm-5.30am

9am-4.30pm

8.30am- 3.30pm

7pm-5.30am

 

 

 

Rimutaka Hill Road

Stop/go traffic control to repair barriers

Barriers

8am-4pm

 

 

 

 

 

 

  

Location

  
  

Type of work

  
  

Sun 114th      

  
  

Mon 125th

  
  

Tue 136th   

  
  

Wed 147th   

  
  

Thu 158th 

  
  

Fri 169th   

  
  

Sat 1710th

  

Owen Street, Belmont, intersectionHorokiwi

Northbound laneLane closed to extend and realign right turn and merge lanes  calibrate speed camera

Safety upgradeSpeed camera

 

 

 

    

 

North of Hebden CrescentPetone, after the overbridge

Northbound lane closed to resurface with asphaltclosed for road repairs

Paving

 

 

 

 

 

 

 

 

SH2/58 Haywards Hill interchangeOwen Street, Belmont, intersection

Lane closures for interchange finishing worksNorthbound lane closed to extend and realign right turn and merge lanes

Link to information

Realign lanes

7pm-5.30am

 

   

 

Whakatiki Street intersectionNorth of Hebden Crescent

Southbound traffic: Follow traffic control instructions forNorthbound lane closures or detours while   intersection upgradedclosed to resurface with traffic signalsasphalt

Traffic signalsPaving

  

   √

 

 

 

Upper Hutt, from Akatarawa Road intersection to   Vista Crescent, Brown OwlSH2/58 Haywards Hill interchange

Stop/go traffic control to upgrade footpath, kerb and channelLane closures for   interchange finishing works

Roadside upgradeSH2/58 project

  

 

   √

 

Upper Hutt, north of Topaz Street, BirchvilleWhakatiki Street intersection

Stop/go traffic control toShoulder closed to   install new guardrailtraffic lights

Barrier renewalTraffic signals

 

 

 

 

Haywards intersection to Te Marua, south of golf courseMarua

Caution required for trucks accessing/exiting riverbank stabilisation worksStop/go at various   locations for road marking

Riverbank worksRoad marking

 

                

                                                             

                                     

State Highway 58 

                             

Paremata Road

Ivey Bay to Postgate Drive

Stop/go traffic control to install new stormwater grates and clear debris

East of Postgate Drive, below Bosun Terrace

Stop/go traffic control to reinstate concrete barriers

Maintenance

7pm-5.30am

 

 

 

 

 

 

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 114th      

  
  

Mon 125th

  
  

Tue 136th   

  
  

Wed 147th   

  
  

Thu 158th 

  
  

Fri 169th   

  
  

Sat 1710th

  

Haywards Hill intersection finishing works

North of the quarry

Stop/go traffic control tocontrol to install ducts under road

Near the electricity sub-station

Lane closed to install   electronicinstall electronic sign

SH2/58 project

7pm-5.30am

 

 

 

 

                          

                                   

                                      

             

 


Viewing all articles
Browse latest Browse all 1600

Trending Articles