Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 1600

Nelson and Tasman maintenance programme

$
0
0

Well maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Nelson and Tasman regions, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for the coming week from 1912 June 2017.

State Highway 6

Location

Type of Work

Start Date

Wakapuaka
Traffic to be controlled by stop/go while crews carry out tree removal

Tree Removal

Monday - Friday

Rocks Road
Shoulder closure while crews conduct sea wall repairs

Structures Maintenance

Monday - Friday

Rocks Road
Traffic to be controlled by stop/go while crews carry out resurfacing works.

Pavement Renewals

Monday – Friday
(At night)

Annesbrook Drive
Traffic management in place while crews carry out pavement renewals

Update: This work has taken a little longer than expected and crews will be working on Saturday 17th and Monday 19th. We appreciate your patience while this work is completed .

Pavement Renewals Monday

State Highway 60

Location

Type of Work

Start Date

Fearon Street Motueka
Traffic to be controlled by stop/go while resurfacing works are conducted

Surface Renewals

Monday - Friday

NOTE: If bad weather should strike, work will be postponed to the next suitable day / night .

Location

Type of Work

Start Date

Wakapuaka
Traffic to be controlled by stop/go while crews carry out surfacing repairs

Surfacing Repairs

Monday - Wednesday

Rocks Road
Shoulder Closures in place while crews carry out sea wall repairs

Structures Maintenance

Tuesday - Friday

Annesbrook
Traffic management in place while crews carry out pavement renewals

Update: Some work may continue between 4 – 6pm to allow sufficient time for cooling of the pavement. We will monitor traffic to ensure flow is maintained .

Pavement Renewals

Wednesday - Saturday

Doctor Creek
Traffic to be controlled by stop/go while crews carry out resurfacing works.

Surfacing Renewals

Monday - Tuesday

Korere Straight
Traffic to be controlled by stop/go while crews carry out surfacing repairs

Surfacing Repairs

Thursday - Friday

State Highway 60

Location

Type of Work

Start Date

Takaka Area
Traffic to be controlled by stop/go while shoulder maintenance is conducted

Shoulder Maintenance

Tuesday - Friday

Check also the information regarding resurfacing on SH6, Rocks Road , in Nelson, due to commence on June 19.

NOTE: If bad weather should strike, work will be postponed to the next suitable day / night .


Viewing all articles
Browse latest Browse all 1600

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>