Well maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thanks for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Nelson and Tasman regions, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for the coming week from 1912 June 2017.
State Highway 6
LocationType of Work
Start Date
Wakapuaka
Traffic to be controlled by stop/go while crews carry out tree removal
Tree Removal
Monday - Friday
Rocks Road
Shoulder closure while crews conduct sea wall repairs
Structures Maintenance
Monday - Friday
Rocks Road
Traffic to be controlled by stop/go while crews carry out resurfacing works.
Pavement Renewals
Monday – Friday
(At night)
Annesbrook Drive
Traffic management in place while crews carry out pavement renewals
Update: This work has taken a little longer than expected and crews will be working on Saturday 17th and Monday 19th. We appreciate your patience while this work is completed .
Pavement Renewals MondayState Highway 60
Location | Type of Work | Start Date |
Fearon Street Motueka | Surface Renewals | Monday - Friday |
NOTE: If bad weather should strike, work will be postponed to the next suitable day / night .
Type of Work
Start Date
Wakapuaka
Traffic to be controlled by stop/go while crews carry out surfacing repairs
Surfacing Repairs
Monday - Wednesday
Rocks Road
Shoulder Closures in place while crews carry out sea wall repairs
Structures Maintenance
Tuesday - Friday
Annesbrook
Traffic management in place while crews carry out pavement renewals
Update: Some work may continue between 4 – 6pm to allow sufficient time for cooling of the pavement. We will monitor traffic to ensure flow is maintained .
Pavement Renewals
Wednesday - Saturday
Doctor Creek
Traffic to be controlled by stop/go while crews carry out resurfacing works.
Surfacing Renewals
Monday - Tuesday
Korere Straight
Traffic to be controlled by stop/go while crews carry out surfacing repairs
Surfacing Repairs
Thursday - Friday
State Highway 60
Location | Type of Work | Start Date |
Takaka Area | Shoulder Maintenance | Tuesday - Friday |
Check also the information regarding resurfacing on SH6, Rocks Road , in Nelson, due to commence on June 19.
NOTE: If bad weather should strike, work will be postponed to the next suitable day / night .