Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 1600

Wellington region maintenance programme

$
0
0

 

 

Information about roadworks in the Wellington and Kāpiti regions

Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 2518 June - Saturday 1 JulySaturday 24 June 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.

TUNNELS, MONTHLY MAINTENANCE:Link to 2017 calendar

 

Sunday 2518 June - Saturday 1 July24 June 2017

State Highway 1  

                                   

  

Wed 28 th      

  
  

Thu 29 nd  

  
  

Wed 21 st    

  
  

Thu 22 nd  

  

Traffic signals

7pm-5.30am

 

 

POSTPONED TO SUNDAY NIGHT

Mt Victoria Tunnel

DETOUR FOR VEHICLES via   Newtown or harbour bays while tunnel closed for resurfacing near Basin   Reserve traffic signals

Tunnel pathway OPEN for   pedestrians and cyclists

Paving

9pm-5.30am

 

 

 

 

 

 

 

Aotea Quay off-ramp

DETOUR via other off-ramps while road repairs underway

Wellington City Council

10pm-5.30am

 

 

 

 

 

 

 

 

 

Urban motorway from The Terrace to Johnsonville

Lane closed to clean   cameras – north and southbound

Traffic monitoring

9am-3.30pm

 

 

 

 

 

 

 Vivian   Street to Basin Reserve

Stop/go traffic control to paint road markings

Road marking

Various times at night

 

 

 

 

 

 

 

SH1 Mana slip lane to SH58 Paremata

Stop/go traffic control to resurface SH58 with asphalt

Sunday and Monday night's work was cancelled and asphalting now continues on to Tuesday and Wednesday nights

Paving

7pm-5.30am

  

 

  

√  

 

 

 

 

 

 

 

 

Mana Esplanade

Southbound lane closed   for service works

Wellington Water

 

Telecoms

9pm-4pm

 

 

 

 

 

 

 

 

 

 

 

 

 

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 2518th           

  
  

Mon 2619th

  
  

Tue 2720th   

  
  

Fri 3023thrd     

  
  

Sat 124stth

  

Mt Victoria Tunnel closed

DETOUR FOR VEHICLES via   Newtown or harbour bays while tunnel closed for resurfacing near Basin   Reserve traffic signals

Tunnel pathway OPEN for   pedestrians and cyclists

Paving

9pm-5.30am

 

 

 

 

 

 

Cobham Drive/Evans Bay Parade intersection

Lane closed for traffic   signals upgrade

Molesworth Street overbridgeUrban motorway above railway yards and Thorndon   Quay

Lane closed to install trafficinstall traffic sensor wires under road surface – north and southbound

Traffic monitoring

7pm-11pm7pm-5.30am

 

 

 

 

 

 

 

Tawa southboundChurton Park northbound on-ramp lamppost installation

Lane closure and brief ramp closuresDETOUR via Johnsonville   or Tawa ramps while lighting upgrade completednorthbound on-ramp closed

State highway left-hand   lane closed

Lighting

9pm-5.30am

 

 

 

 

Linden, south of Porirua

Lane closed for centre   median construction

Transmission Gully project

7pm-5am7pm-5.30am

   

  

 

Mana Esplanade

Lane closed for road   marking

Road marking

10pm-5.30am7pm-5.30am

Whenua Tapu, north of the Plimmerton weigh   station off-ramp

Lane closed to make road repairsconduct   practical assessments for traffic control supervisors

RepairsTraining

9am-4pm7pm-5.30am

 

      √

      √

 

 

 

Paekakariki north, Sang Sue CornerPukerua Bay north to Coast Road

Stop/go traffic control to replace barriersinstall retaining wall

Transmission Gully projectSlip repair

10pm-5am7pm-5.30am

 

 

 

 

 

Kapiti Expressway – Raumati Straight and Peka   Peka

Expect traffic controls atcontrols at various times for finishing works

Expressway   project

Various times during the day and night

 

 

   

Old SH1, Paraparaumu to Levin

Lane closed to maintain   power poles – various locations

Electra

8.30am-4.30pm

 

   √

 

Otaki GorgeKimberley Road SH1/57 intersection

Caution: follow traffic control signs while new road markings installed for changeover from Give Way to Stop atLane closed to repair road near intersection

Stop/go for drivers   exiting Otaki Gorge Road

Road markingrepair

10pm-5.30am7am-4pm

 

 

 

 

 

 

                       

 

                                                               

State Highway 2

                                  

 

 

 

 

Upper Hutt, near Topaz Street, Birchville

Stop/go traffic control to clear drains

Drainage

9am-4pm

 

 

 

 

 

 

 

8am-4pm

 

 

 

Rimutaka Hill Road

Stop/go traffic control to repair guardrails and maintain traffic cameras

 

Barriers

 

Traffic monitoring

8am-4pm

 

 

 

 

 

 

 

 

 

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 2518th           

  
  

Mon 2619th

  
  

Tue 2720th   

  
  

Wed 2821thst     

  
  

Thu 2922nd  

  
  

Fri 3023thrd     

  
  

Sat 124stth

  

Owen Street, Belmont, intersection

Northbound lane closed to resurface widened road with asphaltCOMPLETED  Extension and realignment of right turn and merge lanes

ASPHALT RESURFACING POSTPONED TO SUNDAY AND MONDAY NIGHTS

Safety upgrade

7pm-5.30am

  

 

 

   

 

SH2/58 Haywards Hill interchange

Lane closures for interchangefor   interchange finishing works

SH2/58 project

Various times during the day and night

 

   √

 

Whakatiki Street intersection, Upper Hutt

DETOUR for northbound   traffic turning into Upper Hutt: Turn at Gibbons StreetDETOURS Follow the signs

Northbound   traffic turning into Upper Hutt - use Gibbons Street

DETOUR for southbound   traffic: Follow signsSouthbound traffic - detour via slip lane into Whakatiki Street,St, then Shakespeare AvenueAve and Moonshine   RoadRd to rejoin SH2 south

Traffic signals

10pm-5.30am9pm-5.30am

 

Upper Hutt, north of Topaz Street, Birchville

Stop/go traffic control tocontrol to install new guardrail

Barrier renewal

7pm-5.30am

 

 

 

Te Marua, south of the golf club

Stop/go traffic control to remove machinery from riverbank erosion control site

Riverbank works

 

9am-3.30pm

 

 

 

 

 

 Near Kaitoke Loop Road

Stop/go traffic control for trimming and removal of trees

                      

                                                                                        

                                     

State Highway 58 

                                        

                                        

  

Hours

  
  

Sun 25 th       

  
  

Mon 26 th

  
  

Hours

  
  

Sun 18 th    

  
  

Mon 19 th

  

9.30am-4.30pm

7pm-5.30am

Paremata Road, Joseph Banks Drive to Postgate Drive

DETOUR Sunday and Monday nights while road closed for seawall repairs in Duck Creek and Bradeys Bay

 

Stop/go traffic control for seawall repairs

 

 

 

 

9pm-5.30am

 

 

 

 

 7pm-5.30am

  

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

  

 

 

Paremata Boating Club to intersection and   roundabout to SH1

Stop/go traffic control to resurface SH58 with asphalt

Traffic may at times be sent a different way round the roundabout

Paving

9pm-5.30am

  

 

 

 

 

 

 

 

 

 

Paremata Road

Road shoulder closed for water pump maintenance

Wellington Water

 9am-4pm

 

 

 

 

 

 

  

Location

  
  

Type of work

  
  

Tue 2720th   

  
  

Wed 2821thst     

  
  

Thu 2922nd  

  
  

Fri 3023thrd     

  
  

Sat 124stth

  

Haywards Hill intersection finishing works

North of the quarry

Stop/go traffic control to install ducts under road

Near the electricity sub-station

Lane closed to install   electronic sign

SH2/58 project

 

 

 

 

 

              

                          

                                   

                                      

             

 


Viewing all articles
Browse latest Browse all 1600

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>