Information about roadworks in the Wellington and Kāpiti regions
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for Sunday 2518 June - Saturday 1 JulySaturday 24 June 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
TUNNELS, MONTHLY MAINTENANCE:Link to 2017 calendar
Sunday 2518 June - Saturday 1 July24 June 2017
State Highway 1
Wed 28 th
Thu 29 nd
Wed 21 st
Thu 22 nd
Traffic signals
7pm-5.30am
√
√
√
√
√
POSTPONED TO SUNDAY NIGHT
Mt Victoria Tunnel
DETOUR FOR VEHICLES via Newtown or harbour bays while tunnel closed for resurfacing near Basin Reserve traffic signals
Tunnel pathway OPEN for pedestrians and cyclists
Paving
9pm-5.30am
Aotea Quay off-ramp
DETOUR via other off-ramps while road repairs underway
Wellington City Council
10pm-5.30am
√
√
√
Urban motorway from The Terrace to Johnsonville
Lane closed to clean cameras – north and southbound
Traffic monitoring
9am-3.30pm
√
Vivian Street to Basin Reserve
Stop/go traffic control to paint road markings
Road marking
Various times at night
√
√
√
√
√
SH1 Mana slip lane to SH58 Paremata
Stop/go traffic control to resurface SH58 with asphalt
Sunday and Monday night's work was cancelled and asphalting now continues on to Tuesday and Wednesday nights
Paving
7pm-5.30am
√
√
√
√
Mana Esplanade
Southbound lane closed for service works
Wellington Water
Telecoms
9pm-4pm
√
√
√
√
√
√
Location |
Type of work |
Hours |
Sun 25 |
Mon 26 |
Tue 27 |
Fri 30 |
Sat 1 | ||
Mt Victoria Tunnel closed DETOUR FOR VEHICLES via Newtown or harbour bays while tunnel closed for resurfacing near Basin Reserve traffic signals Tunnel pathway OPEN for pedestrians and cyclists | Paving | 9pm-5.30am | √ |
|
|
|
|
|
|
Molesworth Street overbridge Lane closed to install traffic | Traffic monitoring | 7pm-11pm |
| √ |
|
|
|
|
|
Tawa southbound Lane closure and brief ramp closures
| Lighting | 9pm-5.30am | √ | √ | |
|
|
| |
Linden, south of Porirua Lane closed for centre median construction | Transmission Gully project | 7pm-5am | √ | √ |
|
| √ | | |
Mana Esplanade Lane closed for road marking | Road marking | 10pm-5.30am | √ | √ | √
| √ | |||
Lane closed to make road repairs | Repairs | 9am-4pm |
| | |
| √ |
| |
Paekakariki north, Sang Sue Corner Stop/go traffic control to replace barriers | Transmission Gully project | 10pm-5am | |
| √ | | |
| |
Kapiti Expressway – Raumati Straight and Peka Peka Expect traffic controls at | Expressway project | Various times during the day | | √ | √ | √ | √ |
| |
Old SH1, Paraparaumu to Levin Lane closed to maintain power poles – various locations | Electra | 8.30am-4.30pm |
| √ | √ | √ | √ |
| |
Otaki Gorge Caution: follow traffic control signs while new road markings installed for changeover from Give Way to Stop at Stop/go for drivers exiting Otaki Gorge Road | Road marking | 10pm-5.30am | √ |
| |
|
|
|
State Highway 2
Upper Hutt, near Topaz Street, Birchville
Stop/go traffic control to clear drains
Drainage
9am-4pm
√
8am-4pm
√
√
√
√
Rimutaka Hill Road
Stop/go traffic control to repair guardrails and maintain traffic cameras
Barriers
Traffic monitoring
8am-4pm
√
√
√
√
Location |
Type of work |
Hours |
Sun 25 |
Mon 26 |
Tue 27 |
Wed 28 |
Thu 29 |
Fri 30 |
Sat 1 |
Owen Street, Belmont, intersection Northbound lane closed to resurface widened road with asphalt
| Safety upgrade | 7pm-5.30am | √ | √ | |
|
|
|
|
SH2/58 Haywards Hill interchange Lane closures for interchange | SH2/58 project | Various times during the day | | √ | √ | √ | √ | √ |
|
Whakatiki Street intersection, Upper Hutt DETOUR for northbound traffic turning into Upper Hutt: Turn at Gibbons Street
DETOUR for southbound traffic: Follow signs | Traffic signals | 10pm-5.30am | √ | √ | | √ | √ | ||
Upper Hutt, north of Topaz Street, Birchville Stop/go traffic control to | Barrier renewal | 7pm-5.30am | √ | √ | | √ | √ |
|
|
Te Marua, south of the golf club Stop/go traffic control to remove machinery from riverbank erosion control site | Riverbank works
| 9am-3.30pm |
| √ |
|
|
|
|
|
State Highway 58
Hours
Sun 25 th
Mon 26 th
Hours
Sun 18 th
Mon 19 th
9.30am-4.30pm
7pm-5.30am
√
√
√
√
√
Paremata Road, Joseph Banks Drive to Postgate Drive
DETOUR Sunday and Monday nights while road closed for seawall repairs in Duck Creek and Bradeys Bay
Stop/go traffic control for seawall repairs
9pm-5.30am
7pm-5.30am
√
√
√
√
√
Paremata Boating Club to intersection and roundabout to SH1
Stop/go traffic control to resurface SH58 with asphalt
Traffic may at times be sent a different way round the roundabout
Paving
9pm-5.30am
√
√
Paremata Road
Road shoulder closed for water pump maintenance
Wellington Water
9am-4pm
√
Location |
Type of work |
Tue 27 |
Wed 28 |
Thu 29 |
Fri 30 |
Sat 1 | ||
Haywards Hill intersection finishing works
Near the electricity sub-station Lane closed to install electronic sign | SH2/58 project |
| √ | √ | √ |
|
|
|