Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 1600

Videos

$
0
0

For more videos visit the NZ Transport Agency on YouTube .

Project overview

Huntly section flyover videos

May 2017

thumbnail="https://i.ytimg.com/vi/kOkuRRFO96o/hqdefault.jpg?r=38953"]http://youtu.be/kOkuRRFO96o[/embed]
February 2017

thumbnail="https://i.ytimg.com/vi/Az3Rn6nWXe4/hqdefault.jpg?r"]http://www.youtube.com/watch?v=Az3Rn6nWXe4[/embed]
October 2016

thumbnail="https://i.ytimg.com/vi/x-gnLfln6Vs/hqdefault.jpg?r"]http://youtu.be/x-gnLfln6Vs[/embed]
April 2016

Waikato Expressway, Huntly Section aerial flyover. November 2015. Three months into the project the Fulton Hogan HEB Joint Venture had completed enabling works including fencing the project, some vegetation clearing and environmental controls.

Back to top

Project updates

Keep up to date with the latest project news on the Huntly Section of the Waikato Expressway. These videos will be updated every six months with background information on the project and construction progress along the 15.2km section.

December 2016

July 2016

June 2016

February 2016

Back to top

Taupiri Pass timelapse videos

The Huntly section of the Waikato Expressway will connect to the already completed Ohinewai section in the north, and to the completed Ngāruawāhia section at Taupiri. The project involves 3.5 million cubic metres of earthworks, including a 60 metre cutting through the Taupiri Range where 1 million cubic metres of material will be moved.

April to May 2017

February to March 2017

December 2016 to January 2017

October to November 2016

August to September 2016

June to July 2016

April to May 2016

February to March 2016

October 2015 to January 2016

Back to top

Animated flyover of the proposed Huntly section of the Waikato Expressway

May 2011

Animated flyover of the Huntly section of the Waikato Expressway. The animation flies over the Huntly section twice – once– once travelling south, and once travelling north.

Back to top

Animated road-level view of the proposed Huntly section of the Waikato Expressway

May 2011

Animated road-level view of the Huntly section of the Waikato Expressway. This animation travels along the Huntly section at road level twice – once– once travelling south, and once travelling north. The Huntly section of the Waikato Expressway commences approximately 500m north of Frost Road, and passes to the east side of Huntly township before continuing through the Taupiri Range to meet the Ngāruawāhia sectionNgāruawāhia section at Gordonton Road.

Back to top


Viewing all articles
Browse latest Browse all 1600

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>