Information about roadworks in the Wellington and Kāpiti regions
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for Sunday 169 July - Saturday 22Saturday 15 July 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
TUNNELS, MONTHLY MAINTENANCE:Link to 2017 calendar
NGAURANGA GORGE SLIP
SEVERE WEATHER WARNING
Saturday 7.30am: All southbound lanes closed for half an hour while mesh for slip face is helicoptered in. Thereafter, expect occasion closures for slip works. All lanes to be open for peak morning commuter traffic on Monday morning.
Please drive with extra caution on the region's roads during the heavy rain and strong winds. Snow is falling at times on the Rimutaka Hill Road.
Currently all highways in the Greater Wellington region are open.
NGAURANGA GORGE SLIP
General: Caution heading southbound, two lanes open, one closed with barriers around cleared slip face.face
Northbound lanes open
Sunday 169 July - Saturday 22Saturday 15 July 2017
State Highway 1
√
√
Mt Victoria Tunnel
Detour via Newtown or harbour bays while tunnel closed for routine maintenance
Tunnel
9pm-5.30am
√
√
√
Ngauranga Gorge
Top of the gorge: Northbound lane closed for road repair
Bottom of the gorge: Northbound onramp from SH2
Road repairs
7pm-5.30m
√
Location |
Type of work |
Hours |
Sun 16 |
Mon 17 |
Tue 18 |
Wed 19 |
Thu 20 |
Fri 21 |
Sat 22 |
Cobham Drive/Evans Bay Parade intersection Lane closed to upgrade traffic signals | Traffic signals | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|
SH1 Paterson St to Mt Victoria Tunnel Westbound lane | Wellington Pipelines | 7pm-5.30am |
|
|
| ||||
Terrace Detour via other on and off-ramps while tunnel Tree to be felled in park below Everton Terrace | Tunnel Tree-felling | 9pm-5.30am | √ |
|
| ||||
Between Johnsonville and Churton Park access ramps Lane closed to repair road | Road repairs | 7pm-5.30am |
|
|
| √ | |
|
|
Linden, south of Porirua Southbound lane closed for centre median works | Transmission Gully project | 7pm-5.30am
| √ | √ | √ | √ | √ |
|
|
Porirua, on Mungavin southbound on-ramp Lane | Barrier repair | | √ |
|
|
| |
|
|
Porirua, near Whitford Brown intersection Southbound lane | Road repairs | 7pm-5.30am |
| |
| √ | |
|
|
Southbound lane | Road repairs | 7pm-5.30am |
| |
| √ | | |
|
Mana Esplanade South end: Southbound clearway lane
Central to south: Southbound clearway lane closed for CCTV inspection of stormwater pipe
| Wellington Water | 7pm-5.30am
9am-3.30pm |
| √ √ | √ √ | √ √ | √ √ |
√ |
|
Plimmerton roundabout Lane closed for garden maintenance | Vegetation | 9am-4pm | | | √ | √ |
|
|
|
Plimmerton Weigh Station Northbound lane closed a) to raise service lid to road height
b) to repair road | Road repairs | 9am-4pm
7pm-5.30am |
|
| √ |
|
√ |
|
|
Paekakariki, rail overbridge to Fisherman’s Table Stop/go traffic control for road repairs | Road repairs | 7pm-5.30am |
| √ |
|
| |
| |
Peka Peka, Te Hapua Road south Southbound stop/go traffic control | Road repairs | 7pm-5.30am | | |
|
| √ | |
|
Paraparaumu, north of Ihakara Street Caution required | Road repair | 8.30am-4pm |
| |
|
| √ |
|
|
Lindale, old SH1 Stop/go traffic control for road repairs | Road repair | 7pm-5.30am | |
|
|
| √
|
|
|
Ohau Stop/go traffic control for | Road repairs | 7pm-5.30am |
|
|
| √ |
|
|
|
State Highway 2
Location |
Type of work |
Hours |
Sun 16 |
Mon 17 |
Tue 18 |
Wed 19 |
Thu 20 |
Fri 21 |
Sat 22 |
Normandale overbridge to Melling intersection Southbound lane closed to repair kerb and asphalt | Kerb repairs | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|
Hebden Northbound lane and turning bay closed for road | Road repair | 7pm-5.30am |
|
| √ |
|
| |
|
SH2/58 Haywards Hill interchange Lane closures for interchange finishing works | SH2/58 project | Various times during the day |
| √ | √ | √ | √ | √ |
|
Rimutaka Hill Road Stop/go traffic control to a)repair guardrail
b) repair a patch in the road | Barriers Road repair | 8am-4pm |
|
| √ | √ |
√ | |
|
State Highway 58
Drainage
7pm-5.30am
√
East and west of Moonshine Road
Stop/go traffic control to remove excess bitumen from chipseal with a waterblaster attached to a suction truck
Water cutting
7pm-5.30am
√
√
Judgeford, Moonshine Road to Flightys Road
Stop/go traffic control for tree maintenance
Tree maintenance
7pm-5.30am
√
√
√
√
√
Paremata SH58 Roundabout, opposite Mobil Service Station
Lane closed to install electronic messaging board
Message board
9.30m-4pm
√
Location |
Type of work |
Hours |
Sun 16 |
Mon 17 |
Tue 18 |
Wed 19 |
Thu 20 |
Fri 21 |
Sat 22 |
SH2/58 Haywards Hill Stop/go
| Seawall repairs | Sunday 9pm-5.30am to clean sumps
| √ |
√ |
|
|
|
|
|