Wairarapa maintenance programme

$
0
0

Information about roadworks in the Wairarapa region

Well-maintainedWell maintained roads are an important part of keeping people safe. safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thank you for your patience and understanding while we do this important work.inconvenient.

hanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits. limits during the works and in the following days. If you’re driving around the Wairarapa region,Wairarapa, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for the coming week from Sunday 11 December – Saturday 17 December 2016 .  We’ll keep you posted on future works and have regular updates on local radio stations.Monday 5 December 2016 .

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night. 

State Highway 2

Location

Type of work

Start date

Rimutaka Hill

Stop/go traffic control at several sites

Expect speed restrictions in following days. 

Chipsealing

Roadside repairs

Monday 12th – Friday 16th

8am-4pm

Featherston / south of SH53 intersection
Stop/go traffic control for chipsealing work

Expect speed restrictions in following days. 

Chipsealing

Tuesday 13 th

8am-4pm

South of Andersons Line, Clareville

Stop/go traffic control for chipsealing work

Expect speed restrictions in following days. 

Chipsealing

Wednesday 14 th

8am-4pm

State Highway 53

Location

Type of work

Start date

No planned roadworks along SH53 this week  

-

-

NOTE: If bad weather should strike, work will be postponed to the next suitable night.

Location

Type of work

Start date

Lennies Road / South Opaki
Traffic will be controlled by stop/go while crews chipseal the highway near Lennies Road.

Chipsealing

Monday to Friday

Featherston / SH53 intersection
Traffic will be controlled by stop/go for chipsealing work. 

Chipsealing

Monday to Friday

North of Kaitoke Loop Road
Traffic will be controlled by stop/go traffic management for chipsealing.

Chipsealing

Monday to Friday

Rimutaka Hill Road
Traffic will be controlled by stop/go traffic management for chipsealing near Bridge No 1, truck warning sign repairs on the northern side and installing electronic signage by Dews Construction.

Maintenance and chipsealing

Monday to Friday

All network
Road crews are installing new lane marking arrows on the road surface at multiple locations across the region all week.  Traffic will be controlled by stop / go at these locations.

Installing directional arrows

Sunday to Thursday  

State Highway 53

Location

Type of work

Start date

No planned roadworks along SH53 this week  

-

-

NOTE: If bad weather should strike, work will be postponed to the next suitable night.


Viewing all articles
Browse latest Browse all 1600

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>