Information about roadworks in the Wairarapa region
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for the coming weeksSunday 8 January - Saturday 14 January 2017 . We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
State Highway 2
No roadworks over Christmas-New Year period
-
-
Location | Type of work | Start date |
Featherston, Fitzherbert Street Lane closed for pedestrian overbridge replacement beside state highway | Overbridge | Tuesday 10th - Wednesday 11th 7am-5pm |
Tactile road arrows Stop/go traffic control to paint tactile 'dot matrix' arrows reminding tourists to drive on the left | Road safety | Sunday 8th - Thursday 12th 7pm-5.30am |
State Highway 53
Location | Type of work | Start date |
No planned roadworks until mid January | - | - |