Information about roadworks in the Nelson-Marlborough-Tasman region
Well maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thanks for your patience and understanding while we do this important work.There is no maintenance work planned for the Christmas holiday period.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for the coming week from 16 January 2017. We’ll keep you posted on future works and have regular updates on local radio stations.
State Highway 6
Location | Type of work | Start date |
Collins Valley - Whangamoa | Surface Repairs | Monday to Friday |
Gladstone Road
| Surface Repairs | Tuesday to Thursday Nights
|
Kawatiri Intersection – Owen River | Guardrail Installation | Monday to Friday |
NOTE: If bad weather should strike, work will be postponed to the next suitable day / night
Maintenance work will resume on 9 January 2017.