Information about roadworks in the Wairarapa region
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for Sunday 15 January - Saturday 21 January 2017 . We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
State Highway 2
Rimutaka Hill Road, near Bridges 1 and 4
Stop/go traffic control for resurfacing highway
Chipsealing
Tuesday 17 th
7pm-5.30am
Location | Type of work | Start date |
Rimutaka Hill Road heading north, tourist 'dot matrix' arrows Stop/go traffic control for installing tactile 'drive on the left' arrows on highway through the region
| Road marking | Monday 16 th - Thursday 19 th 7pm-5.30am |
State Highway 53
Location | Type of work | Start date |
| - | - |