Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 1600

Wellington region maintenance programme

$
0
0

Information about roadworks in the Wellington and Kāpiti regions

Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 2215 January - Saturday 2821 January 2017 follows. We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.

THURSDAY NIGHT WORKS POSTPONED DUE TO WET WEATHER 

Sunday 22 January15 January - Saturday 2821 January 2017

State Highway 1

Churton Park to Tawa

Northbound lane closed for drainage works

Maintenance 

Tuesday 24 th - Wednesday 25 th

9pm-5.30am

South of Tawa interchange

Southbound lane closed for tree removal, occasional delays

Maintenance

Wednesday 25 th - Thursday 26 th

7pm-5.30am

Mana Esplanade

Lane closed for telecoms installations

Telecoms

Wednesday 25 th - Thursday 26 th

9am-4pm

Peka Peka intersection

Lane closed for installation of electronic messaging board

MacKays2PekaPeka Expressway

Wednesday 25 th

8am-4pm

Passing lane, Forest Lakes south to Otaki roundabout

Passing lane closed to manage returning holiday traffic

Traffic control

Monday 23rd

12noon - 8pm

 

Location

Type of work

Start date

Ngauranga southbound flyoverMt Victoria Tunnel

LaneDetour via harbour bays or Newtown while tunnel closed for guardrail repairscamera maintenance

RepairsMaintenance

Tuesday 24 th - Thursday 2617th

9pm-5.30am

Porirua, northbound lanes after Mungavin Overbridge to Whitford Brown Avenue intersection at Waitangirua

Lane closed for northbound road subsurface renovation and asphalt resurfacing

 

Paving

 

Monday 23Tuesday 17rdth -Thursday 26-Thursday 19th

7pm-5.30am

 

Coast Road, north of Pukerua Bay

Stop/go traffic control for road renovation and asphalt resurfacing, north and southbound

Paving

Monday 23Wednesday 18rdth

North and southbound

9pm-5.30amThursday 19 th

Tuesday 24 th

Northbound

8pm-5.30am7pm-5.30am

Paekakariki

Speed restriction for highway traffic, stop/go in and out of township for reinstatement of central highway median barrier

Paving

Tuesday 24Sunday 15th- Thursday 26- Thursday 19th

9pm-5.30am7pm-5.30am

Paraparaumu, near southbound traffic lightsGreenhill Road, north of Waikanae

Lane closedStop/go traffic control for road repairrepairs

MaintenancePaving

Tuesday 24Thursday 19th

9am-4pm7pm-5.30am

Otaki River Bridge south to Te Horo

Stop/go traffic control for chipseal resurfacing northbound and southbound lanes

Followed by speed restrictions while chip beds in, sweeping and line-marking

More information here

 Chipseal

Tuesday 24Sunday 15th - Thursday 26Monday 16th chipsealing

7pm-5.30am

 

 Tuesday 17 thspeed restrictions

 day/night

State Highway 2

Major Drive to Grounsell Crescent intersections

Lane closure for asphalt resurfacing southbound lanes

 Paving

Completed

Sunday 15 th - Monday 16 th

7pm-5.30am

Location

Type of work

Start date

Underneath Petone overbridge

MOTORCYCLISTS  TAKE EXTRA CARE, SLOW DOWN TO60KPH               

The skid –resistant topcoat will be removed and cannot be replaced until March while the new asphalt cures.

Paving

Ongoing caution needed on bend while asphalt cures

SH2/58 Interchange

Lane closed for construction of interchange

Interchange

Tuesday 24Monday 16th - Friday 2720th 

9am-4pm

North of Moonshine Hill Road intersection

Stop/go traffic control for road subsurface renovation andresurfacing with asphalt resurfacing

Paving

Monday 23 rd - Wednesday 25Tuesday 17th

9pm-5.30am7pm-5.30am

Totara Park intersectionNorth of Topaz St, Upper Hutt

Stop/go traffic control for road subsurface renovationsurveying, both north and asphalt resurfacingsouthbound

PavingSurvey

Tuesday 24 th - Thursday 26 thCompleted

Monday 16 th

7pm-5.30am9am-4pm

Rimutaka Hill Bridges

Stop/go traffic control for surveying, both north and southbound, Bridges 3 and 4

Stop/go traffic control for chipsealing, Bridges 1 and 4

Survey

Tuesday 17 th

9am-4pm

 

7pm-5.30am

 

     State Highway 58

   LocationType of    work     Start date

Paremata Road between Postgate Drive and James Cook Drive closed

Detour in place through Whitby, road closed for tree-removal, slip and culvert clearing

Heavy vehicles, please use SH1 and SH2 if possible

Maintenance

Tuesday 24th

9am-4pm


Viewing all articles
Browse latest Browse all 1600

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>