Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 1600

Nelson, Marlborough and Tasman maintenance programme

$
0
0

Information about roadworks in the Nelson-Marlborough-Tasman region

Well maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for the coming week from 23 January 2017.16 January 2017 . We’ll keep you posted on future works and have regular updates on local radio stations.

State Highway 6

Surface Repairs 

Tuesday to Thursday Nights

 

Kawatiri Intersection – Owen River
Traffic will be controlled by stop/go while crews install guardrail

Guardrail Installation

Monday to Friday

Location

Type of work

Start date

Collins Valley - Whangamoa
Traffic will be controlled by stop/go while crews carry out surfacing surfacing repairs

Pre SealSurface Repairs

Monday to Friday

Collins Valley - Whangamoa
Traffic will be controlled by stop/go while sealing is undertaken

Resealing 

Friday Gladstone Road
Single traffic lane each direction

 

NOTE: If bad weather should strike, work will be postponed to the next suitable day / night

 


Viewing all articles
Browse latest Browse all 1600

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>