Information about roadworks in the Wairarapa region
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for Sunday 5 February - Saturday 11 February 2017 . We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
Sunday 5 February - Saturday 11 February
State Highway 2
Location |
Type of work |
Start date |
Rimutaka Hill Road | Maintenance | Tuesday 7 th– Wednesday 8 th |
Wairarapa SH2 tourist arrows Stop/go traffic control for installing tactile ‘dot matrix’ directional arrows indicating left-side driving | Tourist safety | Sunday 29th –Thursday 2nd 7pm-5.30am |
Readers Cutting, South of Mt Bruce Stop/go traffic control to install traffic monitor cables on road | Traffic monitoring | Tuesday 7 th 7pm-5.30am |
Mt Bruce Southbound stop/go traffic control to raise road shoulders to road level | Maintenance | Thursday 9 th 8am-5pm |
State Highway 53
Location |
Type of work |
Start date |
Revans Road, from Featherston School to 100km zone Lane closed for chipsealing, stop on request Detour for Martinborough traffic via Boundary Road Speed restriction in following days while chip beds in | Chipseal | POSTPONED Thursday night temperatures will be too low for chipseal setting |