Wellington region maintenance programme

$
0
0

Information about roadworks in the Wellington and Kāpiti regions

Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for  Sunday 26 February - Saturday 4 March 2017 as follows.for Sunday 19 February - Saturday 25 February 2017 follows. We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.

Sunday 26 February - Saturday 4 March 2017

Sunday 19 February - Saturday 25 February 2017

WairarapaState Highway 1 

State Highway 2

Location

Type of work

Start date

High Street, Masterton
Altered lane layout for watermain renewal work.

Watermain renewals

Monday 27th – Thursday 2nd
7am to 6pm

Western Lake Road, Featherston
Stop/go traffic control for dig outs and sway repairs to road surface.

Dig outs and repairs

Thursday 2nd  
8am-4pm

Kaitoke Loop
Stop/go traffic control for chipsealing.

Chipsealing

Tuesday 1 March and Wednesday 1st
7pm to 5:30am

Wairarapa SH2 tourist arrows
Stop/go traffic control for installing tactile ‘dot matrix’ directional arrows indicating left-side driving

Tourist safety

Sunday 26th –Thursday 2nd    
7pm-5.30am

State Highway 53

Location

 

Start date

Featherston School, SH53
A detour will be in place while crews are working on the Sunday evening and a temporary speed limit on Monday for chipsealing.

Chipsealing

Sunday 26th to Monday 27th
4pm to 5:30am

Wellington - Kāpiti

State Highway 1 

Location

Type of work

Start date

Tawa to Churton Park
Lane closures for installation of new guardrails

Guardrail installation

Monday 27th and Tuesday 28th
7pm-5.30am

Thorndon Overbridge
Southbound lane closures for bridge joint replacements

Bridge joint maintenance

Sunday 26th to Monday 27th
7pm-5.30am

Wellington urban motorway
Northbound lane closures for guardrail repairs.

Guardrail repairs

Tuesday 28th
9am to 4pm

Pukerua Bay
Northbound stop/go traffic management for barrier repairs and sign maintenance.

Barrier and sign repairs

Sunday 26th
7pm-5.30am

Approach to Plimmerton roundabout
Southbound lane closure for resurfacing

Resurfacing

Monday 27th
7pm to 5:30am

Ngauranga flyover
Southbound lane closure for lightpole replacement.

Maintenance

Sunday 26th and Monday 27th
7pm-5.30am

Pukerua Bay
Stop/go traffic management for tree removal.

Tree maintenance

Monday 27th
7pm-5.30am

Paremata Bridge to Paremata Roundabout, water main maintenance
Lane closed north and southbound for night works and stop/go traffic management and detours at times.

Wellington Water

Sunday 26th – Thursday 2nd   
7pm-5.30am

Churton Park
Northbound lane closure for tree removal work.

Tree maintenance

Wednesday 20th
7pm-5.30am

Raumati Straight
Lane closed for project works

MacKays2PekaPeka

Sunday 19th to Thursday 23rd 7pm-5.30am

Waikawa Bridge
Stop/go traffic control for guardrail repair work.

Guardrail repairs

Tuesday 28th
7pm-5.30am

Otaihanga
Contraflow for Jet driveway works.

Jet / Culvert works

Wednesday 1st March
7pm-5.30am

Peka Peka
Stop/go traffic management for culvert slearing.

Culvert works

Wednesday 1st March
7pm-5.30am

Greenhill Road intersection, Waikanae
Stop/go traffic management for A/C levelling.

A/C levelling

Thursday 2nd March
7pm-5.30am

State Highway 2 

Location

Type of work

Start date

Hebden Crescent
Northbound lane closure for end terminal repair work.

Maintenance

Thursday
9am to 3:30pm

SH2/58 Interchange
Lane closures for interchange works

Interchange

Tuesday 20th to Thursday 23rd
9am-4pm

Fergusson Drive Approach
Southbound lane closure for resurfacing

Chipsealing

Tuesday 28th
7pm-5.30am

Mangaroa Hill Road
Lane closure for chipsealing work.

Resurfacing

Tuesday 28th
7pm to 5:30am

Kaitoke
Southbound lane closure for sign replacement. 

Sign replacement

Wednesday 2nd and Thursday 
6pm to 5:30am

State Highway 58 

Location

Type of work

Start date

Haywards Hill Road, Judgeford
Stop/go control for chip sealing near Judgeford.  Daytime speed restrictions while new road surface beds in and lanes are re-marked.

Chipsealing

Monday 27th and Tuesday 28th
7pm-5.30am

LocationType of workStart date
Murphy Street to (and including) Terrace Tunnel
Detour via motorway off and on-ramps while tunnel closed for routine maintenance and resurfacing of motorway.
Tunnel servicing, maintenance work and resurfacingTuesday
9pm-5.30am
Tawa to Churton Park
Lane closures for installation of new guardrails
Guardrail installationSunday 19th to Thursday 23rd
7pm-5.30am
Thorndon Overbridge
Northbound lane closures for bridge joint replacements
Bridge joint maintenanceSunday 19th – Thursday 23rd  
7pm-5.30am
Kiwi Point (Ngauranga Gorge)
Northbound lane closure for slip clearing work
Slip clearingWednesday 15th
7pm-5.30am
Ngauranga Northbound OnRamp
Closed for resurfacing.  Follow detour into Wellington city to gain access to SH1 via motorway.
ResurfacingThursday 23rd
10pm to 5:30am
Aotea Quay Northbound Onramp
Onramp closed for resurfacing.  Follow detour route.
ResurfacingMonday 19th
10pm-5.30am
Hawkestone Street on-ramp
Onramp closed for resurfacing.  Follow detour route.
ResurfacingTuesday 20th
10pm-5.30am
Approach to Plimmerton roundabout
Southbound lane closure for resurfacing
ResurfacingTuesday 20th
7pm to 5:30am
Mungavin southbound, Porirua
Lane closures for resurfacing with asphalt
PavingSunday
7pm-5.30am
Pukerua Bay
Ramp closed for asphalt resurfacing
Detour signposted via Titahi Bay southbound off-ramp
PavingWednesday 15th –Thursday 16th 
7pm-5.30am
Paremata Bridge water main maintenance
Lane closed north and southbound for night works
Wellington WaterSunday 12th – Thursday 16th   
7pm-5.30am
Pukerua Bay rail overbridge
Stop/go traffic control for bridge joint replacements
Bridge jointsWednesday 20th
7pm-5.30am
Raumati Straight
Lane closed for project works
MacKays2PekaPekaSunday 19th to Thursday 23rd 7pm-5.30am
Otaki rail overbridge
Stop/go traffic control for bridge joint replacements
Bridge jointsThursday 23rd
7pm-5.30am

State Highway 2 

LocationType of workStart date
Ngauranga to Petone
Northbound lane closure for culvert clearing
MaintenanceTuesday 20th
7pm-5.30am
SH2/58 Interchange
Lane closures for interchange works
InterchangeTuesday 20th to Thursday 23rd
9am-4pm
Fergusson Drive Approach
Southbound lane closure for resurfacing
ChipsealingThursday 23rd
7pm-5.30am
Kennedy Good Bridge Interchange
Lane closures for work on the end terminals.
MaintenanceSunday 19th and Monday 20th
7pm-5.30am
Akatarawa Road
Northbound lane closure for installation of Give Way signs
Give Way signsThursday 23rd
7pm-5.30am
North of Kaitoke Loop Road
Stop / go for resurfacing
  Chipsealing Wednesday 22nd and Thursday 23rd
6pm to 5:30am
Mangaroa Hill Road
Stop/go traffic control for resurfacing
ResurfacingWednesday 22nd
7pm to 5:30am

State Highway 58 

LocationType of workStart date
Haywards Hill Road
Stop/go control for chip sealing between Moonshine Hill Road and east of Harris Road.  Daytime speed restrictions while new road surface beds in and lanes are re-marked.
ChipsealingSunday 19th to Wednesday 22nd
7pm-5.30am
SH58
Stop/go control for channel clearing at various locations.
Channel clearingWednesday 22nd
7pm-5.30am